Sunday, October 27, 2013

Workshop: Finishing the Floor

This month I finished all of the remaining structural bits and flooring for the workshop.  The first thing was to build a cripple wall on the far end to support the edge of the floor:

And then lay down some flooring:

On the near side, I need to build a step up into the workshop before I can finish this course of flooring:

Here I've framed up a box to support the step into the workshop:

The step with a riser to support the edge of the workshop floor:

Now we're ready to put down more subfloor:

Around the corner from the entrance there is a nook where I needed to hang the last joist and frame up another cripple wall:

And now I can put the rest of the floor down:

The last piece of flooring is down:

Entrance to my new workshop:

0 comments:

Post a Comment