This month I finished all of the remaining structural bits and flooring for the workshop. The first thing was to build a cripple wall on the far end to support the edge of the floor:
On the near side, I need to build a step up into the workshop before I can finish this course of flooring:
Here I've framed up a box to support the step into the workshop:
The step with a riser to support the edge of the workshop floor:
Now we're ready to put down more subfloor:
Around the corner from the entrance there is a nook where I needed to hang the last joist and frame up another cripple wall:
And now I can put the rest of the floor down:
The last piece of flooring is down:
Entrance to my new workshop:

0 comments:
Post a Comment