Sunday, September 29, 2013

Workshop: Framing the Second Half

Framing the east half of the workshop means placing a column between the garage doors to support a built-up LVL beam that will carry one end of the joists.  Here I've gotten the bolts epoxied in place and ready for the column:

Now the column is set and grouted in position:

Column with the beam set on top:

Now I'm drilling holes to bolt the beam into the saddle:

Moving over to the stair landing, here is my custom fabricated beam hanger bolted onto the other column:

Viewing that same beam from above, you can see the perimeter of the replacement landing all framed up:

After hanging some joists, here is the landing with the deck on it:

Looking out from the new landing, here is the floor all framed up:

0 comments: