Saturday, June 14, 2014

Rebuilding the Back Doorway

Here is a picture of the preexisting disaster we have to deal with that is the back door.  For starters, you are looking at what is supposed to be the exterior face of the door oriented inwards.  There is better than a 1' drop down from the floor to the threshold.  If you look at the built up1 header above the door, you can see that it was carefully engineered to do absolutely nothing since there are zero members resting on it to carry any load through it.  Also note that the door was placed in the middle of a braced wall panel with no reinforcement to make up for cutting the crossbrace.  I'm sure the situation above the window is an identical abomination.  Oh well, this is roughly what I expected to find.

1A footnote on the header mentioned above - upon deconstruction we find that this 'header' is not built up at all - where we would naturally expect to find two 2x8's with a filler strip sandwiched in between and through nailed to each other, we actually just find a scrap of particle board and then a 2x4 that was in fact cut in two so that it wan't even bearing on the jack stud:


With the old door out of the way, this is a view down where we will build a proper threshold.  Here we have anchor bolts set in the concrete for our baseplate:

It was raining sprinking outside, so I tacked together a shelter that actually did a fine job of keeping the worksite dry:

New threshold built:

Opening cut out higher to accept a proper door.  Notice how much more smoothly the top 10" of the opening is cut.

The wall is flashed and we've dug for footers to support a porch:

Snoopy flew over to see what we were working on:

Ledger board bolted to the wall to carry the far end of the porch:


Porch and step framed up and ready for a deck:

The completed porch:


Proper door from the inside:

Friday, February 14, 2014

Rebuilding the Stairwell Wall

Here is the old wall that lines the upper part of the stairwell leading down into the garage.  There is really nothing holding it up, which needs to be remedied.  In the corner there is a cutout to give the required headroom above the foot of the stair.  It doesn't need to extend all the way to the ceiling, so we can reclaim some usable space with a shorter cutout underneath a counter top.

Looking up at the stairway headroom cutout, you can see that it extends up two stories and leaves a fair amount of volume underutilized.

After some demolition, the old wall is torn out and we are ready to rebuild:

To carry the new wall, I need a way to secure a header built up from 2x's across the top of the end of the steel I-beam.  I decided to fabricate a knife plate out of some steel plate: a piece of 1/4" plate for the base with mounting holes drilled out, a piece of 1/2" plate for the knife with holes drilled to allow bolting the header in place, and a 1/4" plate as a bracket.

Getting the Miller Multimatic dialed in:

Welding the knife plate together:


Here is the knife plate bracket welded, primed and mounted to the I-beam:

This is the finished built up header bolted in place:

I can make this corner of the shop usable by only bringing the headroom cutout up about a foot and then putting some shelves and a cabinet on top.  Here I've begun framing it up.

I want the toe kick under at the base of counter to be a comfortable distance from the back of the counter top and the wall, so I need to extend the bulkhead over the well hole about 8".  The plywood deck extends flush with the edge of the beam, so I need to carefully trim it back so I can splice a small piece of decking with it over the beam.  One plywood scrap tacked to the floor as a fence and another to support the front edge of the router base and keep it from tipping will make this easy:

With the decking trimmed back from the edge of the beam, I can add a header to carry both the other edge of the spliced decking and a pony wall to form the front edge of the headroom cutout:

The headroom box all framed up:

The new wall all built and ready for a counter to be hung along it:

Sunday, October 27, 2013

Workshop: Finishing the Floor

This month I finished all of the remaining structural bits and flooring for the workshop.  The first thing was to build a cripple wall on the far end to support the edge of the floor:

And then lay down some flooring:

On the near side, I need to build a step up into the workshop before I can finish this course of flooring:

Here I've framed up a box to support the step into the workshop:

The step with a riser to support the edge of the workshop floor:

Now we're ready to put down more subfloor:

Around the corner from the entrance there is a nook where I needed to hang the last joist and frame up another cripple wall:

And now I can put the rest of the floor down:

The last piece of flooring is down:

Entrance to my new workshop:

Sunday, September 29, 2013

Workshop: Framing the Second Half

Framing the east half of the workshop means placing a column between the garage doors to support a built-up LVL beam that will carry one end of the joists.  Here I've gotten the bolts epoxied in place and ready for the column:

Now the column is set and grouted in position:

Column with the beam set on top:

Now I'm drilling holes to bolt the beam into the saddle:

Moving over to the stair landing, here is my custom fabricated beam hanger bolted onto the other column:

Viewing that same beam from above, you can see the perimeter of the replacement landing all framed up:

After hanging some joists, here is the landing with the deck on it:

Looking out from the new landing, here is the floor all framed up:

Saturday, August 31, 2013

Workshop: Welding a New Column Base

The column base that I fabricated before was wide enough that it was going to separate the garage door rails more than I wanted, so I decided to make a new one.  Luckily I had enough half-inch plate around, so I set off on the tedious task of grinding off the old base without destroying the column.

Carefully grinding off the old base without damaging the column:

A cutoff wheel can make fairly nice cuts in 1/2" plate if you are patient enough:

I laid out all the positions on the new plate, which is 6 1/2" wide:

I bored 9/16" holes for the bolts over on the drill press and now the base is ready to be welded to the column:

My new Miller Multimatic ready to be put into service:

With the last weld bead laid down, the new column is built:

This mild steel cleaned up nicely after a good sanding and is ready for some primer: